buy
  • Buy
  • Rent
4
mm nagar
Trichy
  • Buy
    2,417 / sq ft
  • Rent

MM Nagar Property

    Projects in mm nagar

    Neighbourhood

    Nearby localities to mm nagar

    One stop platform for real estate news and updates

    Top real estate articles

    • 10th Jul 18

      All You Need To Know About Mumbai Metro Line 7

      The Mumbai Metro Line 7 is a partially elevated corridor spanning a length of 16.5 kilometres with 14 stations from Andheri (East) to Dahisar East. There are plans to extend the corridor, by 9 km, to Chhatrapati Shivaji International Airport (terminal T2) from Andheri (East), and to Mira Road-Bhayendar from Dahisar. The project is being developed at an estimated cost of Rs 6,208 crore and is expected to be operational by 2019.
    • 25th Jun 18

      Mumbai Metro Line-IV To Get Operational By 2021

      The Mumbai Metro Line-IV has been planned as a fully elevated corridor with 32 stations from Wadala near south Mumbai and Kasarvadavli near Thane West via Ghatkopar and Mulund. There are plans to extend the line by 2.7 kilometres to Gaimukh. The 32.32-kilometre Metro corridor has an estimated cost of Rs 14,549 crore and is expected to be completed by 2021.
    • 28th Jun 18

      Here’s How Metro Line VI Will Impact Property Prices In Mumbai

      The Line VI of the Mumbai Metro network will connect Lokhandwala Complex (Swami Samarth Nagar) in Andheri and goes up to Kanjurmarg in eastern suburbs of Mumbai via Jogeshwari and Vikhroli. With an estimated cost of Rs 6,672 crore, the 14.5-kilometre corridor will have 13 stations with interchange option to metro lines 2, 3 and 4. The Mass Rapid Transit System (MRTS) will boost east-west connectivity in the Mumbai Metropolitan Region (MMR).
    • 12th Jun 18

      Mumbai Metro Line 2A To Get Operational By 2020

      The Mumbai Metro Line II is being constructed in two sub-phases with 18-km line 2A between Dahisar and DN Nagar; and the 23-km line 2B between DN Nagar and Mankhurd. Construction works begun in 2016 and the DMRC plans to open one part of this line (2A) for the public by 2020.
    • 20th Jun 18

      All You Need To Know About Mumbai Metro Line III

      The line III of the Mumbai Metro is a 33.5-km underground corridor from Colaba in south Mumbai to Seepz in the north via Bandra. It is being implemented in phases with the first phase from Aarey Milk Colony to the airport to be thrown open by March 2021 while the second phase from Cuffe Parade is expected to open in December same year. Developed at an estimated cost of Rs 23,136 crore, the project will have 21 stations and advanced features to prevent subway flooding during rains.

    Localities comparison in Trichy

    • buy
    • rent
    Locality already added to compare
    Some error occured

    Locality name

    price (per sq.ft)

    Growth

    Available properties

    mm nagar

    333 - 2,499-

    KK Nagar

    477 - 2,70127%

    Samayapuram

    201 - 68035.1%

    Viralimalai

    200 - 4,000-

    Balaji Nagar

    972 - 1,050-

    JK Nagar

    1,350 - 1,450-

    Ramalinga Nagar

    200 - 3,200-

    Trichy Madurai Highway

    196 - 1,887-
    You are currently offline.