buy
  • buy
  • rent

Supertech Eco Village 3

20.99L - 65L
2,106/ sq ft Onwards
the price/sqft of this property is lower than the avg price/sqft of Sector 16B Noida Extension
EMI from ₹ 16,120
for 20 years
Under Construction
Status
Jun 2017
Possession Date
Apartment
Type
Supertech Eco Village 320.99L - 65L

Supertech Eco Village 3 Configurations

  • Buy
  • Rent
  • Apartments
  • Villas
  • Residential Plots
  • 20.9L - 30.9L
  • 30.8L - 34.7L
  • 35L - 36.2L
  • 36.5L - 38.8L
  • 39L - 40L
  • 40.3L - 43.7L
  • 44.2L - 47.7L
  • 47.8L - 55.7L
  • 56.5L - 81.5L
  • request price
  • 1 bhk
    570 sqft
  • 2 bhk
    795 - 930 sqft
  • 2 bhk
    840 - 965 sqft
  • 2 bhk
    890 - 930 sqft
  • 2 bhk
    965 sqft
1 bhk apartment (570sqft)
3,684/sqft
  • shower
    1 bathroom
  • age-property-old
     emi 16,120 /month
see all properties
contact sellers
didn't find what you were looking for?

Best home loans for this project

property details
20.9L
1 bhk, 570 sq ft
  • 1 bhk, 570 sq ft(20.9 L)
  • 2 bhk, 795 sq ft(24.5 L)
  • 2 bhk, 925 sq ft(30.8 L)
  • 3 bhk, 1,175 sq ft(31.1 L)
  • 2 bhk, 930 sq ft(35.1 L)
  • 3 bhk, 1,200 sq ft(35 L)
  • 2 bhk, 1,105 sq ft(36.5 L)
  • 3 bhk, 1,155 sq ft(36.7 L)
  • 2 bhk, 1,150 sq ft(39 L)
  • 3 bhk, 1,155 sq ft(39 L)
  • 3 bhk, 1,200 sq ft(40.3 L)
  • 2 bhk, 1,175 sq ft(45 L)
  • 3 bhk, 1,275 sq ft(44.2 L)
  • 3 bhk, 1,505 sq ft(47.8 L)
  • 3 bhk, 1,290 sq ft(56.5 L)
loan amount
interest
emi
Loading Bank Details....
compare banks
get me a home loan
our experts will call you soon
or call us at 080-30-196-296
our experts are known for
90%
closure rate
1500+
happy customers
₹ 350 cr
disbursement
calculate again

Supertech Eco Village 3 Description

8.5
Project Score

Key Details

Availability
New, Resale
Size
495 - 1,865 sq ft
Total Area
11 acres
Launch Date
Nov 2011

Supertech Eco Village 3 Amenities

Lift Available
Car Parking
Power Backup
24 X 7 Security
Children's play area
Vaastu Compliant
Club House
Gymnasium
Swimming Pool
Sports Facility
Indoor Games
Jogging Track
Intercom
Golf Course
Cafeteria
Rain Water Harvesting
Staff Quarter
Landscaped Gardens

Supertech Eco Village 3 Specifications

Doors

  • Internal
    Wooden Frame
  • Main
    Wooden Frame

Flooring

  • Master Bedroom
    Vitrified Tiles
  • Toilets
    Ceramic Tiles
  • Living/Dining
    Vitrified tiles
  • Balcony
    Ceramic Tiles
  • Kitchen
    Vitrified Tiles
  • Other Bedroom
    Vitrified tiles

Walls

  • Exterior
    Texture Paint
  • Kitchen
    Ceramic Tiles Dado up to 2 Feet Height Above Platform
  • Toilets
    Ceramic Tiles Dado up to 7 Feet Height Above Platform

Others

  • Windows
    Powder Coated Aluminium Sliding
  • Wiring
    Concealed Copper Wiring with Circuit Breakers
  • Switches
    Modular Switches
  • Frame Structure
    Earthquake resistant RCC superstructure

Fittings

  • Kitchen
    Stainless Steel Sink with CP Fittings
  • Toilets
    CP Fittings

Supertech Eco Village 3 construction images

  • Supertech Eco Village 3 Construction Status

    Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

    Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

    Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

    Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

  • Supertech Eco Village 3 Construction Status

Feb 2017
Jul 2016
Apr 2016

pre-approved home loans

Know Your Neighbourhood

  • master plan
  • nearby
  • Commute
loading map...
last update - 21-04-2017
You are currently offline.