buy
  • Buy
  • Rent
8.9
civil lines
Nagpur

Overview

  • Buy
    10,626 / sq ft
    Avg. price (2,3,3+ bhk)
  • Rent
    29,980 / month
    Avg. rent (1,2,3,3+ bhk)

Civil Lines Property

  • Apartment (8)
  • Villa (3)

Projects in civil lines

top builders

Neighbourhood

Nearby localities to civil lines

One stop platform for real estate news and updates

Top real estate articles

  • 19th Nov 18

    How Delhi Metro Influenced Property Prices In NCR

    The Delhi Metro has influenced the real estate prices of localities lying close to stations. The areas lying in extreme proximity to the Metro station witnessed an average 50 per cent jump in the cost of construction. The latent effect was more visible on the rental market where the asking values have been going up as the connectivity gets better. MakaaniQ lists locations that have benefitted from the different routes of the Delhi Metro.
  • 19th Aug 16

    How Delhi Urban Art Commission Shapes The National Capital

    MakaaniQ looks at the role the Delhi Urban Art Commission plays in shaping the aesthetic beauty of the national capital.
  • 26th Nov 18

    All You Need To Know About Mumbai Metro Line 7

    The Mumbai Metro Line 7 is a partially elevated corridor spanning a length of 16.5 kilometres with 14 stations from Andheri (East) to Dahisar East. There are plans to extend the corridor, by 9 km, to Chhatrapati Shivaji International Airport (terminal T2) from Andheri (East), and to Mira Road-Bhayendar from Dahisar. The project is being developed at an estimated cost of Rs 6,208 crore and is expected to be operational by 2019.
  • 10th Dec 18

    Delhi To Have London-Like Metro-Rail Interlinked Corridor

    The National Capital Region Transport Corporation on December 7 approved the detailed project report of the Delhi-Gurgaon-Shahjahanpur-Neemrana-Behror Urban Complex RRTS corridor. The 106 km-corridor, which will have 16 stations, is one of the three RRTS corridors the government has planned to decongest the national capital region. The other two corridors will be built between Delhi-Meerut and Delhi—Panipat. These corridors would be linked to the Delhi Metro network, offering a multi-modal integrated transit system.
  • 26th Nov 18

    Mumbai Metro Line 2A To Get Operational By 2020

    The Mumbai Metro Line II is being constructed in two sub-phases with 18-km line 2A between Dahisar and DN Nagar; and the 23-km line 2B between DN Nagar and Mankhurd. Construction works begun in 2016 and the DMRC plans to open one part of this line (2A) for the public by 2020.

Localities comparison in Nagpur

  • buy
  • rent
Locality already added to compare
Some error occured

Locality name

price (per sq.ft)

Growth

Available properties

civil lines

8,728 - 12,525-11.2%

Wathoda

2,011 - 24,479-37.1%

Besa

1,354 - 28,990-18%

Hingna

1,626 - 3,74490.1%

Jamtha

260 - 3,62922.7%

Gotal Pajri

1,478 - 23,945-35.2%

Mihan

1,047 - 46,13618.7%

Beltarodi

2,192 - 20,881-7.4%

Hingna Road

2,014 - 21,360-21.4%

Manish Nagar

2,354 - 5,676-1.2%

Wardha Road

1,445 - 22,50513.6%
You are currently offline.