buy
  • Buy
  • Rent
saki naka
Mumbai

Overview

  • Buy
    15,226 / sq ft
    Avg. price (1,2,3 bhk)
  • Rent
    30,942 / month
    Avg. rent (1,2 bhk)

Saki Naka Property

  • Apartment (9)

Projects in saki naka

top builders

  • Gundecha

    52 years experience
    2 completed projects

Neighbourhood

Nearby localities to saki naka

One stop platform for real estate news and updates

Top real estate articles

  • 28th Jun 18

    Here’s How Metro Line VI Will Impact Property Prices In Mumbai

    The Line VI of the Mumbai Metro network will connect Lokhandwala Complex (Swami Samarth Nagar) in Andheri and goes up to Kanjurmarg in eastern suburbs of Mumbai via Jogeshwari and Vikhroli. With an estimated cost of Rs 6,672 crore, the 14.5-kilometre corridor will have 13 stations with interchange option to metro lines 2, 3 and 4. The Mass Rapid Transit System (MRTS) will boost east-west connectivity in the Mumbai Metropolitan Region (MMR).
  • 26th Jun 18

    All You Need To Know About Mumbai Metro's Line V

    The Line V of the Mumbai Metro will connect Kapurbawdi in Thane West to Kalyan via Bhiwandi. Being constructed at an estimated cost of Rs 8,416 crore, the corridor spans a total length of 24.9 kilometres with an interchange facility with Line IV from Kapurbawdi junction. An elevated corridor, the project is expected to improve Mumbai-Thane connectivity while increasing employment opportunities and creating growth centres. Some localities which are expected to benefit from the project include Nilje, Bhiwandi and Kalyan. The project is expected to be completed by 2022.
  • 28th Jun 18

    5 Reasons Why You Should Invest In Kandivali West

    In the recent years, Kandivali West has transformed into a thriving destination, with many residential projects in the vicinity. The locality has witnessed rapid development in the last two decades both in terms of residential growth and population.
  • 25th Jun 18

    Mumbai Metro Line-IV To Get Operational By 2021

    The Mumbai Metro Line-IV has been planned as a fully elevated corridor with 32 stations from Wadala near south Mumbai and Kasarvadavli near Thane West via Ghatkopar and Mulund. There are plans to extend the line by 2.7 kilometres to Gaimukh. The 32.32-kilometre Metro corridor has an estimated cost of Rs 14,549 crore and is expected to be completed by 2021.
  • 20th Jun 18

    All You Need To Know About Mumbai Metro Line III

    The line III of the Mumbai Metro is a 33.5-km underground corridor from Colaba in south Mumbai to Seepz in the north via Bandra. It is being implemented in phases with the first phase from Aarey Milk Colony to the airport to be thrown open by March 2021 while the second phase from Cuffe Parade is expected to open in December same year. Developed at an estimated cost of Rs 23,136 crore, the project will have 21 stations and advanced features to prevent subway flooding during rains.

Localities comparison in Mumbai

  • buy
  • rent
Locality already added to compare
Some error occured

Locality name

price (per sq.ft)

Growth

Available properties

saki naka

14,449 - 16,130-6.4%

Chembur

9,807 - 34,98631.3%

Powai

6,690 - 99,872-12.7%

Bhandup West

3,370 - 98,38881.4%

Goregaon East

7,105 - 35,50048.6%

Kandivali East

5,866 - 1,48,22213.4%

Thane West

1,878 - 85,72619.8%

Seawoods

1,917 - 99,95072.2%

Kharghar

2,210 - 77,247-19%

Mira Road East

2,096 - 62,5967.2%

Ulwe

2,921 - 65,01144.4%
You are currently offline.