buy
  • Buy
  • Rent
marine lines
Mumbai

Projects in marine lines

Neighbourhood

Nearby localities to marine lines

One stop platform for real estate news and updates

Top real estate articles

  • 8th Jun 18

    All You Need To Know About Mumbai Coastal Road

    The first phase of the Mumbai Coastal Road project, a proposed 34-kilometre freeway running along the western coastline, is expected to begin by October 2018. The freeway will link Princess Street Flyover near Marine Lines to the south-end of the Bandra-Worli Sea Link (BWSL) under Phase-I and upto Kandivali under Phase-II. The project will be developed at an estimated cost of Rs 15,000 crore and will decongest the Western Express Highway and boost real estate developments across the western Mumbai.
  • 10th Jul 18

    All You Need To Know About Mumbai Metro Line 7

    The Mumbai Metro Line 7 is a partially elevated corridor spanning a length of 16.5 kilometres with 14 stations from Andheri (East) to Dahisar East. There are plans to extend the corridor, by 9 km, to Chhatrapati Shivaji International Airport (terminal T2) from Andheri (East), and to Mira Road-Bhayendar from Dahisar. The project is being developed at an estimated cost of Rs 6,208 crore and is expected to be operational by 2019.
  • 26th Jun 18

    All You Need To Know About Mumbai Metro's Line V

    The Line V of the Mumbai Metro will connect Kapurbawdi in Thane West to Kalyan via Bhiwandi. Being constructed at an estimated cost of Rs 8,416 crore, the corridor spans a total length of 24.9 kilometres with an interchange facility with Line IV from Kapurbawdi junction. An elevated corridor, the project is expected to improve Mumbai-Thane connectivity while increasing employment opportunities and creating growth centres. Some localities which are expected to benefit from the project include Nilje, Bhiwandi and Kalyan. The project is expected to be completed by 2022.
  • 20th Jun 18

    All You Need To Know About Mumbai Metro Line III

    The line III of the Mumbai Metro is a 33.5-km underground corridor from Colaba in south Mumbai to Seepz in the north via Bandra. It is being implemented in phases with the first phase from Aarey Milk Colony to the airport to be thrown open by March 2021 while the second phase from Cuffe Parade is expected to open in December same year. Developed at an estimated cost of Rs 23,136 crore, the project will have 21 stations and advanced features to prevent subway flooding during rains.
  • 25th Jun 18

    Mumbai Metro Line-IV To Get Operational By 2021

    The Mumbai Metro Line-IV has been planned as a fully elevated corridor with 32 stations from Wadala near south Mumbai and Kasarvadavli near Thane West via Ghatkopar and Mulund. There are plans to extend the line by 2.7 kilometres to Gaimukh. The 32.32-kilometre Metro corridor has an estimated cost of Rs 14,549 crore and is expected to be completed by 2021.

Localities comparison in Mumbai

  • buy
  • rent
Locality already added to compare
Some error occured

Locality name

price

Growth

Available properties

Chembur

20,747 - 1,18,24231.3%

Powai

30,534 - 2,47,936-12.7%

Goregaon East

25,476 - 1,26,30248.6%

Kandivali East

15,943 - 1,81,74513.4%

Thane West

7,226 - 1,25,20719.8%

Seawoods

12,963 - 3,48,51372.2%

Kharghar

7,594 - 1,93,349-19%

Mira Road East

5,679 - 69,5317.2%

Virar

2,623 - 1,39,7315.9%

Ulwe

4,458 - 23,52,38,67344.4%
You are currently offline.