buy
  • Buy
  • Rent
5.3
chowk
Mumbai

Overview

  • Buy
    32,478 / sq ft
    Avg. price (1,2,3 bhk)
  • Rent
    1,49,444 / month
    Avg. rent (1,2,3 bhk)

Chowk Property

  • Apartment (18)

top builders

Neighbourhood

Nearby localities to chowk

One stop platform for real estate news and updates

Top real estate articles

  • 4th Sep 18

    Gurgaon Gets Gurugaman Buses, Connecting Old With New

    A fleet of 25 low-floor non-AC buses has been rolled out to cover some key areas connecting old and new Gurgaon. The buses will connect Sector 10 bus terminal with the Huda City Metro Station, a 12-km stretch that would cover major junctions, including Basai Chowk, Atul Kataria Chowk, IFFCO Chowk, Subhash Chowk and Hero Honda Chowk. Over 200 more buses are expected to be added to this fleet by March 2019.
  • 27th Aug 18

    Why Administrations' Must Not Ignore Unauthorised Constructions, Dilapidated Homes

    Given the kind of construction mushrooming across cities, unapproved or unauthorised constructions are a reality and it cannot be ignored. The recent examples from Lucknow, Andhra Pradesh are proof enough. Mind where you are investing.
  • 26th Jul 18

    New Metro Links To Boost Noida Property Market

    After the first trial run that was conducted in April between Greater Noida Depot and Sector 147, the second set of runs began on July 25. The trial run is now being conducted between Noida Sector 83 and Greater Noida Metro Depot. The project being developed by the Noida Metro Rail Corporation (NMRC) at an estimated cost of Rs 5,503 crore, is expected to become operational in December this year.
  • 26th Jun 18

    All You Need To Know About Mumbai Metro's Line V

    The Line V of the Mumbai Metro will connect Kapurbawdi in Thane West to Kalyan via Bhiwandi. Being constructed at an estimated cost of Rs 8,416 crore, the corridor spans a total length of 24.9 kilometres with an interchange facility with Line IV from Kapurbawdi junction. An elevated corridor, the project is expected to improve Mumbai-Thane connectivity while increasing employment opportunities and creating growth centres. Some localities which are expected to benefit from the project include Nilje, Bhiwandi and Kalyan. The project is expected to be completed by 2022.
  • 20th Jun 18

    All You Need To Know About Mumbai Metro Line III

    The line III of the Mumbai Metro is a 33.5-km underground corridor from Colaba in south Mumbai to Seepz in the north via Bandra. It is being implemented in phases with the first phase from Aarey Milk Colony to the airport to be thrown open by March 2021 while the second phase from Cuffe Parade is expected to open in December same year. Developed at an estimated cost of Rs 23,136 crore, the project will have 21 stations and advanced features to prevent subway flooding during rains.

Localities comparison in Mumbai

  • buy
  • rent
Locality already added to compare
Some error occured

Locality name

price (per sq.ft)

Growth

Available properties

chowk

24,382 - 41,833-25.9%

Chembur

9,509 - 35,07131.3%

Powai

2,645 - 85,692-12.7%

Bhandup West

3,232 - 1,00,93881.4%

Goregaon East

5,029 - 35,53848.6%

Kandivali East

4,684 - 1,21,02313.4%

Thane West

1,327 - 1,17,27319.8%

Kharghar

2,280 - 76,089-19%

Mira Road East

1,964 - 66,8747.2%

Dombivali

2,779 - 37,528-32.3%

Ulwe

3,096 - 61,22044.4%
You are currently offline.