buy
  • Buy
  • Rent
10
civil lines
Jabalpur

Projects in civil lines

Neighbourhood

Nearby localities to civil lines

One stop platform for real estate news and updates

Top real estate articles

  • 19th Aug 16

    How Delhi Urban Art Commission Shapes The National Capital

    MakaaniQ looks at the role the Delhi Urban Art Commission plays in shaping the aesthetic beauty of the national capital.
  • 21st Aug 18

    Anand Vihar Integrated Transport Hub To Be A Reality Soon

    Anand Vihar will be converted into an integrated transport hub where people plying from different areas of the neighbouring state via bus terminus and railway station will be able to enjoy the swift Metro route on Pink and Blue Line.
  • 10th Jul 18

    All You Need To Know About Mumbai Metro Line 7

    The Mumbai Metro Line 7 is a partially elevated corridor spanning a length of 16.5 kilometres with 14 stations from Andheri (East) to Dahisar East. There are plans to extend the corridor, by 9 km, to Chhatrapati Shivaji International Airport (terminal T2) from Andheri (East), and to Mira Road-Bhayendar from Dahisar. The project is being developed at an estimated cost of Rs 6,208 crore and is expected to be operational by 2019.
  • 26th Jun 18

    All You Need To Know About Mumbai Metro's Line V

    The Line V of the Mumbai Metro will connect Kapurbawdi in Thane West to Kalyan via Bhiwandi. Being constructed at an estimated cost of Rs 8,416 crore, the corridor spans a total length of 24.9 kilometres with an interchange facility with Line IV from Kapurbawdi junction. An elevated corridor, the project is expected to improve Mumbai-Thane connectivity while increasing employment opportunities and creating growth centres. Some localities which are expected to benefit from the project include Nilje, Bhiwandi and Kalyan. The project is expected to be completed by 2022.
  • 20th Jun 18

    All You Need To Know About Mumbai Metro Line III

    The line III of the Mumbai Metro is a 33.5-km underground corridor from Colaba in south Mumbai to Seepz in the north via Bandra. It is being implemented in phases with the first phase from Aarey Milk Colony to the airport to be thrown open by March 2021 while the second phase from Cuffe Parade is expected to open in December same year. Developed at an estimated cost of Rs 23,136 crore, the project will have 21 stations and advanced features to prevent subway flooding during rains.
You are currently offline.