buy
  • Buy
  • Rent
appa junction
Hyderabad
  • Buy
    4,109 / sq ft
    Avg. price (2,3 bhk)
  • Rent
    14,500 / month
    Avg. rent (2 bhk)

Appa Junction Property

  • Apartment (4)
  • Villa (1)

Projects in appa junction

Neighbourhood

Nearby localities to appa junction

One stop platform for real estate news and updates

Top real estate articles

  • 14th Dec 18

    Modi To Lay Foundation Stone For Mumbai Metro's Line 5

    Prime Minister Narendra Modi on December 18 will inaugurate the Metro Line-5 of the Mumbai Metro network that will connect Kapurbawdi in Thane West to Kalyan via Bhiwandi. The PM, along with Maharashtra CM Devendra Fadnavis, will also lay the foundation stone for the Metro Line-9 (Dahisar- Mira Bhayander). The Mumbai Metropolitan Region Development Authority (MMRDA) is in the process of selecting contractors and general consultant for the project after the project was approved in October 2017. The project is expected to be completed by 2022.
  • 30th Nov 18

    Will 102-Km Elevated Corridor In Bengaluru Fix Traffic Woes?

    The Karnataka government on November 29 gave its approval to construct a 102-kilometre elevated corridor project in Bengaluru. The project, which was conceptualised 12 years ago, once constructed will ensure smoother traffic across north-south, east-west and in the central parts of the city. The development work will start in January next year and will be undertaken by the Karnataka Road Development Corporation Limited. The project, to be constructed at a cost of Rs 25,495 crore, is likely to be completed by 2025.
  • 29th Nov 18

    Dilshad Garden-Ghaziabad Metro Route To Become Operational On December 25

    After much dilly-dallying, the Dilshad Garden-Ghaziabad Metro line will be flagged off on December 25 by Prime Minister Narendra Modi. The trial run on the 9.41-kilometre (km) line has been already completed. PropGuide lists some facts on the Ghaziabad Metro network.
  • 26th Nov 18

    All You Need To Know About Mumbai Metro Line 7

    The Mumbai Metro Line 7 is a partially elevated corridor spanning a length of 16.5 kilometres with 14 stations from Andheri (East) to Dahisar East. There are plans to extend the corridor, by 9 km, to Chhatrapati Shivaji International Airport (terminal T2) from Andheri (East), and to Mira Road-Bhayendar from Dahisar. The project is being developed at an estimated cost of Rs 6,208 crore and is expected to be operational by 2019.
  • 26th Oct 18

    Mumbai Metro Line-IV To Get Operational By 2021

    The Mumbai Metro Line-IV has been planned as a fully elevated corridor with 32 stations from Wadala near south Mumbai and Kasarvadavli near Thane West via Ghatkopar and Mulund. There are plans to extend the line by 2.7 kilometres to Gaimukh. The 32.32-kilometre Metro corridor has an estimated cost of Rs 14,549 crore and is expected to be completed by 2021.

Localities comparison in Hyderabad

  • buy
  • rent
Locality already added to compare
Some error occured

Locality name

price (per sq.ft)

Growth

Available properties

appa junction

4,009 - 4,20911.1%

Kukatpally

3,698 - 9,04338.2%

Gachibowli

2,969 - 27,52717.4%

Rajendra Nagar

4,009 - 6,2441.9%

Tellapur

3,186 - 7,8247.8%

Adibatla

131 - 33,641282.4%

Kothur

125 - 12,919-

Maheshwaram

119 - 60,300-6.5%

Shadnagar

136 - 73,251126.7%

Kadthal

106 - 49,369569.6%

Tukkuguda

181 - 17,399-
You are currently offline.