buy
  • Buy
  • Rent
kadamba depot road
Goa
  • Buy
    5,770 / sq ft
    Avg. price (1,3+ bhk)
  • Rent

Kadamba Depot Road Property

  • Apartment (2)
  • Villa (1)

Projects in kadamba depot road

Neighbourhood

Nearby localities to kadamba depot road

One stop platform for real estate news and updates

Top real estate articles

  • 28th Dec 18

    Mumbai Metro Line-IV To Get Operational By 2022

    The extension of the Line-IV of the Mumbai Metro, connecting south Mumbai with suburb Thane, on December 27 received approval from the Maharashtra Cabinet. The line, once operational, will link the Gaimukh near south Mumbai with Kasarvadavli in Thane via Ghatkopar and Mulund through a fully elevated corridor. The total cost of the project is estimated to be about Rs 14,549 crore with an additional Rs 949 crore sanctioned for the extension. The authorities are planning to complete this project by March 2022, benefitting over 8.7 lakh commuters.
  • 26th Nov 18

    All You Need To Know About Mumbai Metro Line 7

    The Mumbai Metro Line 7 is a partially elevated corridor spanning a length of 16.5 kilometres with 14 stations from Andheri (East) to Dahisar East. There are plans to extend the corridor, by 9 km, to Chhatrapati Shivaji International Airport (terminal T2) from Andheri (East), and to Mira Road-Bhayendar from Dahisar. The project is being developed at an estimated cost of Rs 6,208 crore and is expected to be operational by 2019.
  • 26th Nov 18

    Mumbai Metro Line 2A To Get Operational By 2020

    The Mumbai Metro Line II is being constructed in two sub-phases with 18-km line 2A between Dahisar and DN Nagar; and the 23-km line 2B between DN Nagar and Mankhurd. Construction works begun in 2016 and the DMRC plans to open one part of this line (2A) for the public by 2020.
  • 4th Oct 18

    Bhopal, Indore May Have Metros By 2022

    The Centre has given its approval for the Metro projects, worth Rs 14,000 crore, to be built in these two cities. The projects will be ready to roll in the next four years.
  • 26th Jul 18

    New Metro Links To Boost Noida Property Market

    After the first trial run that was conducted in April between Greater Noida Depot and Sector 147, the second set of runs began on July 25. The trial run is now being conducted between Noida Sector 83 and Greater Noida Metro Depot. The project being developed by the Noida Metro Rail Corporation (NMRC) at an estimated cost of Rs 5,503 crore, is expected to become operational in December this year.

Localities comparison in Goa

  • buy
  • rent
Locality already added to compare
Some error occured

Locality name

price (per sq.ft)

Growth

Available properties

kadamba depot road

5,738 - 5,80224.9%

Mapusa

3,336 - 10,791-7.9%

Porvorim

3,343 - 28,429-14.3%

Caranzalem

6,217 - 8,597-3.6%

Dona Paula

7,176 - 12,1434.6%

Calangute

3,195 - 46,656-21.6%

Candolim

6,975 - 34,50651.7%

Nerul

10,256 - 15,2193.1%

Siolim

4,706 - 9,42565.2%

Aldona

3,689 - 11,711-1.2%

Miramar Circle

21,547 - 21,580-
You are currently offline.