buy
  • Buy
  • Rent
depot chouraha
Bhopal
  • Buy
  • Rent
    18,000 / month
    Avg. rent (3 bhk)

Depot Chouraha Property

  • Apartment (1)

Projects in depot chouraha

Neighbourhood

Nearby localities to depot chouraha

One stop platform for real estate news and updates

Top real estate articles

  • 26th Nov 18

    All You Need To Know About Mumbai Metro Line 7

    The Mumbai Metro Line 7 is a partially elevated corridor spanning a length of 16.5 kilometres with 14 stations from Andheri (East) to Dahisar East. There are plans to extend the corridor, by 9 km, to Chhatrapati Shivaji International Airport (terminal T2) from Andheri (East), and to Mira Road-Bhayendar from Dahisar. The project is being developed at an estimated cost of Rs 6,208 crore and is expected to be operational by 2019.
  • 26th Nov 18

    Mumbai Metro Line 2A To Get Operational By 2020

    The Mumbai Metro Line II is being constructed in two sub-phases with 18-km line 2A between Dahisar and DN Nagar; and the 23-km line 2B between DN Nagar and Mankhurd. Construction works begun in 2016 and the DMRC plans to open one part of this line (2A) for the public by 2020.
  • 26th Oct 18

    Mumbai Metro Line-IV To Get Operational By 2021

    The Mumbai Metro Line-IV has been planned as a fully elevated corridor with 32 stations from Wadala near south Mumbai and Kasarvadavli near Thane West via Ghatkopar and Mulund. There are plans to extend the line by 2.7 kilometres to Gaimukh. The 32.32-kilometre Metro corridor has an estimated cost of Rs 14,549 crore and is expected to be completed by 2021.
  • 4th Oct 18

    Bhopal, Indore May Have Metros By 2022

    The Centre has given its approval for the Metro projects, worth Rs 14,000 crore, to be built in these two cities. The projects will be ready to roll in the next four years.
  • 26th Jul 18

    New Metro Links To Boost Noida Property Market

    After the first trial run that was conducted in April between Greater Noida Depot and Sector 147, the second set of runs began on July 25. The trial run is now being conducted between Noida Sector 83 and Greater Noida Metro Depot. The project being developed by the Noida Metro Rail Corporation (NMRC) at an estimated cost of Rs 5,503 crore, is expected to become operational in December this year.

Localities comparison in Bhopal

  • buy
  • rent
Locality already added to compare
Some error occured

Locality name

price

Growth

Available properties

depot chouraha

18,000-

Hoshangabad Road

10,929 - 27,403-4.9%

Arera Colony

14,123 - 30,44093.9%

Kolar Road

10,471 - 21,985-9.8%

Ayodhya By Pass

6,87519.4%

Ayodhya Bypass Road

16,500-6%

Bawadiya Kalan

11,538 - 23,577-17.3%

Bawaria Kalan

11,000 - 18,50014.4%

Bhopal Kheri Road

15,746 - 1,18,492-

South Bhopal Main

15,139 - 43,152-
You are currently offline.