Specifications
STRUCTURE
A solid RCC Frame Structure designed for Seismic Zone II.
Concrete Solid Blocks for walls. Cement Sand Plaster.
FLOORING
Common Area: Granite in all floors (Podium plus 18 floors).
Staircases: Kota Stone.
Living/Dining: Marble floor/Vitrified Tiles.
Bedrooms: Marble Floor/ Ceramic tiles.
Kitchen: Ceramic antiskid tiles.
Balcony: Ceramic antiskid tiles.
Skirting: Matching material of floor.
DOORS
Entrance Door: Teakwood frame with teakwood architraves. Teak paneled door shutters.
Toilet Doors: Hardwood frames. Flush door shutters with teak finish on one side and painted on the other.
All other Doors: Hardwood frames.
Flush door shutters with one side teak veneer.
DOOR FITTINGS
Good Quality/reputed make hardware.
BALCONY & UTILITY DOORS AND WINDOWS AND VENTILATORS
Aluminum with 3 rail accommodating flyscreen, anodized, safety M. S. Painted grills for all windows.
KITCHEN
 |
Black Granite slab platform on Steel Brackets, Painted. |
 |
Stainless steel sinks and drains board. |
 |
Wall dado up to 600 mm above platform. |
 |
Provision for exhaust fan. |
 |
Required power outlets for appliances. |
PAINTING
 |
Plastic Emulsion Paint for all internal walls. |
 |
Oil bound distemper for ceilings. |
 |
Cement paint in common area and ducts. |
 |
High quality weather resistant paint in external textured finish. |
ELEVATORS
Two lifts with a capacity of 10 persons each and 1 service lift of 1200 Kg for each block of Mitsubishi make (Total : 36 Nos.)
ELECTRICAL
 |
Concealed conduit; copper wiring. |
 |
Power and lighting points as required |
 |
MCB as required. |
 |
4 KW Power for single bedroom apartment. |
 |
4 KW Power for two bedrooms apartment. |
 |
5 KW Power for three-bedroom apartment. |
TELEPHONE
Telephone points in living room, and in all bedrooms.
MODEM/INTERNET/BROAD BAND CONNECTIVITY
Points provided in all bedrooms and living rooms.
TELEVISION
Points provided in living room and in Master Bedroom.
ACCESS CONTROL
Intercom and CC TV to control entry of Visitors at Lobby Level.
GENERATOR POWER BACKUP
100% power back up for common area and lifts. 1 KW Power backup for each apartment with automatic change over switch.
GEYSER POWER POINT
All bedroom attached toilets and also the kitchen will have Geyser points.
AIR CONDITIONING
Electrical and drain points will be provided for all the AC units in Bedroom and Living Room.
(split units to be installed by apartment owners)
TOILETS
Ceramic floor.
Dado upto false ceiling.
European water closet and wash basin in Star White colour.
Bath tub in Master bedroom Toilet.
WATER SUPPLY
Cold Water pipe - G I of Class B/CPVC.
Hot Water pipe - G I of Class B/CPVC.
Insulated C.P.Fittings of reputed make-Jaguar or equivalent.
Supply from underground/overhead storage tank to required quantity.
Water treatment plant.
SEWAGE
Sewage treatment plant.
Flushing of toilets by using treated water to conserve energy.
|